top of page

Commercial Window Treatments: More Than Window Dressing

  • Writer: tiffany parker
    tiffany parker
  • Jul 13
  • 2 min read

What Most Specifications Miss

Window treatment specifications in commercial projects are frequently treated as a line item afterthought - something resolved at the end of a project, after the meaningful design decisions have been made. This sequencing is backwards. In environments where occupant comfort, energy performance, and code compliance are real requirements, window treatments should be integrated into the design from the early planning stages.


The Performance Variables That Matter


Solar heat gain coefficient (

In the DC metro region, east- and west-facing glazing can generate significant thermal load during peak hours, driving up cooling costs throughout the summer months. Selecting solar shades with appropriate openness factors, typically 3 to 5% for office environments, reduces HVAC demand and lowers operating costs over the life of the building. It is one of the few interior specifications with a direct, measurable impact on the building's energy budget.


Glare control vs. view preservation

Glare control and view preservation are competing priorities that require careful calibration. A 1% openness factor eliminates glare but eliminates the view. A 10% factor preserves the view but may fall short on southern exposures in the afternoon. The right specification depends on window orientation, occupancy type, and how the space is used. When this decision is made without that context, the result is either occupants working with blinds permanently closed or screens they cannot see, neither of which reflects well on the building.


Motorization and building systems integration

Motorized window treatments are no longer a luxury specification. They are an increasingly standard requirement in commercial projects. When integrated with lighting controls, building management systems (BMS), and occupancy sensors, automated shades contribute to energy efficiency, occupant comfort, and LEED or WELL certification credits. Specified correctly and coordinated early, motorization adds measurable value. Specified in isolation and retrofitted during commissioning, it adds cost and schedule risk.


Fire rating and code compliance

Fire and flame spread ratings are non-negotiable in commercial window treatment specifications. In the DMV, compliance starts with NFPA 701 and extends to IBC requirements and local amendments that vary by occupancy type. Most specification errors in this area are not intentional. They happen when materials are selected for aesthetics or cost without a working knowledge of the applicable code. The result is the same regardless of intent: failed inspections, liability exposure, and full replacement at the owner's cost. Compliance is not a checkbox. It is a specification discipline that needs to be built into the process from the start.


From the Field: When a Shipment Delay Threatened a Showing

A DMV property manager's window treatment order was delayed in transit. A prospective tenant tour was already on the calendar and could not move. We installed temporary cellular shades at no charge so the showing proceeded as scheduled. When the permanent order arrived, we returned the next day and completed the full installation.

The request came in late and the timeline was tight. The property manager and her assistant were satisfied with the outcome. Delivering under constrained conditions, without passing the problem to the client, is the standard we hold ourselves to.


Maison Wynn Contract specifies, sources, and installs commercial window treatments across the DMV - with full attention to performance, compliance, and design intent. Request a consultation for your next window schedule.

 
 
 

Comments


bottom of page